How to plan Option as independent demand item
This is in response to Rahul's query yesterday.
Steps are
1. Do a where who to identify which all option class this option belong to
2. Go to the BOM of each option and set the planning % = 0(zero) for the options which you want to plan as independent item
3. Go to Item Master and set the Item Level Planning Attribute for the item t='MPS Planned Item'
4. Load demand at Option Level
MRP will start planning Option as independent item and ignore the Option will calculating the dependent demand from the BOM of parent item
Steps are
1. Do a where who to identify which all option class this option belong to
2. Go to the BOM of each option and set the planning % = 0(zero) for the options which you want to plan as independent item
3. Go to Item Master and set the Item Level Planning Attribute for the item t='MPS Planned Item'
4. Load demand at Option Level
MRP will start planning Option as independent item and ignore the Option will calculating the dependent demand from the BOM of parent item